Clermont-Ferrand (63)
Missions G2AVP + G2PRO + G4 + Geotechnical surveys + Engineering
Client : Foncière Grand Mess
Sol Solution was commissioned to carry out geotechnical work on a hotel-restaurant project in CLERMONT-FERRAND. With an area of approximately 3,500 m², the project extends over 6 levels (R+4 with basement).
Sol solution carried out the G2AVP and G2PRO design missions, concluding with a general invert solution for the project’s foundations. Given the circulation of water and the proximity of neighbouring areas (roads), a Berliner wall support solution was selected and sized for the construction of the invert and basement.
During the execution phase, Sol Solution validated the calculation notes and monitored the execution of the geotechnical works on site.