Aulnat (63)

Missions G2AVP + G2PRO + G3 + Geotechnical surveys + Engineering

Client : Clermont Auvergne Métropole

Design and build company : NGE GC

The project involves a number of complex geotechnical elements :

  • Moulded wall (20 m high, 40 m diameter)
  • An invert 1.5 m thick at the bottom of the basin, reinforced by 155 micropiles 20 m below the level of the invert. These micropiles provide stability against water pressure and the effects of swelling of the marl under the invert.
  • Operating buildings on hollow auger piles with management of ascent speeds and drilling parameters.
  • Earthworks with water table and lowering (estimates of water inflow and pumping).

Stay tuned